The production calendar, redefined
High-caliber calendar
StudioBinder’s production calendar gives you full control over your entire project schedule, from the day-to-day details to managing the big picture.
PRODUCTION CALENDAR EVENTS
Blazing fast drag-and-drop interface
Productions change in the blink of an eye. You need a production calendar that can keep up with your changing workflow needs.
Having a timeline (or "gantt") calendar makes it more effective to get a clear, birds-eye perspective of progress and conflicts.
It couldn't be easier. Just click and drag to draw events. Drag the ends to adjust length.
Set it up in minutes, make necessary changes within seconds. With StudioBinder, keep total control over the full production pipeline, customize views, and adapt as needed on the fly.
PROJECT MANAGEMENT
Add tasks, files, notes, and more
StudioBinder’s powerful project management software keeps your tasks, documents, conversations, and collaborations in one place. As straightforward as it is simple, you'll never have to dig through fragmented emails, files, and notes.
Everything in your production calendar resides right there in the console, in the cloud, from scripts to breakdowns, shot lists to storyboards, shooting schedules to call sheets, and more. Fully adaptable. Fully collaborative.
FILTERS
Focus on what matters
Precise filtering tools let you focus on what really matters. Search for your event; hide non-work days; and filter by status, color, crew members, or due dates.
As your productions grow, you can narrow your focus to stay on track. Whether you're looking six months out or just at the day's work, you get to see your entire end-to-end production pipeline.


CALENDAR TEMPLATES
If your calendar's not broken, don't fix it
Save your custom production calendar as a new template so you can apply it to future projects. Or, start with a preset template that fits your needs.
The production calendar feature is perfect for agencies, studios, production companies, or departments with large, regular video outputs.
You’ve already perfected a workflow for your brand. Don't reinvent the wheel for every project.
DEPENDENCIES
Connect the production puzzle pieces
Dependencies within StudioBinder’s production calendar enable you to connect events to one another and detect conflicts at a glance.
You can’t shoot anything without a location, and you can't rehearse without a cast. Plan how the puzzle pieces fit together so you're ready.
The software calls out conflicts so your production moves efficiently from one step to the next.








MASTER CALENDAR
Plan for success, one scene at a time
No need to flip between calendars.
You can finally see the timelines of all of your productions on a single page.
A master calendar to oversee multiples projects in one view.
At a glance, gain insight into how your resources are doing across all projects on monthly, quarterly, or yearly basis.
Explore Features
More storyboard features

Attach Files
Upload files to events, from scripts to deal memos and all between.

Status
Set the status for events. Filter by status to get a snapshot of progress and tasks.

Group Milestones
Keep organized by grouping events together for a more efficient layout.

Assign Colors
Assign colors to make key milestones stand out, just the way you like it.

Calendar Templates
Speed up calendar workflows with pre-made templates, or customize your own.

Tasks
Assign tasks to your team.


"StudioBinder’s production calendars are intuitively designed for film and video professionals on the run. Everything operates off of one main page (where you can even track multiple projects at once). The colorful layout lets you add filters and color codes to keep everything coordinated, organized, and fun.


Jourdan Aldredge, PremiumBeat
Customers
Trusted by the Best
Modernizing production workflows at renowned studios worldwide.
























Today’s productions use StudioBinder to streamline their process, and collaborate on better content together.

"I can be a part of the conversation and see when someone finishes a task."
Watch Testimonial ➜

"StudioBinder makes pre-production that much quicker for out team."
Watch Testimonial ➜

"Call sheet confirmations have instantly made our life that much easier."
Watch Testimonial ➜